2025-02-12
Maintenance And Maintenance Of Electric Screw Press
This document serves as the systematic maintenance guide for AYANK Electric Screw Presses (and C-Series CNC / electro-hydraulic forging hammers), namely the "Maintenance And Maintenance Of Electric Screw Press" . It follows four main threads: pre-commissioning preparation → operating precautions → mechanical maintenance → electrical system care. On the mechanical side, it covers foundation/workbench inspection, the transmission system (thrust bearing axial clearance ≤0.7mm, guide rail composite clearance 0.4–0.6mm, gear mesh 0.5–0.7mm), the braking system, and hydraulic/lubrication circuits. On the electrical side, it addresses the control cabinet, motor connections, pneumatic components, and sensor systems (encoders, level sensors, pressure sensors, etc.). A maintenance rhythm of "every 10,000 cycles + daily/weekly/monthly/quarterly inspections" is clearly defined, aiming to preserve accuracy, extend service life, reduce failures, and stabilize production capacity.
View More