Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)
Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)

Full Hydraulic Open Die Forging Hammer (C66YA 35-875kJ)

The C66YA is a full hydraulic open die forging hammer, configurable to your requirements in 13 capacities from 35 kJ to 875 kJ — 1 ton to 25 ton. Each one is set up for the workpiece you actually forge.

✅ High Precision & Stable Forging

Every blow holds to ±1.5% of the set energy, and the hydraulic system sets that energy rather than a fixed ram stroke — so repeatability holds from the first piece to the last.

✅ Energy Saving & High Efficiency

Over 60% less energy than a steam-air hammer of the same nominal size, at 33 to 75 blows per minute — the saving does not come out of cycle time.

✅ Extended Service Life & Low Failure

X-shaped guide rails on a double-arm frame, and a conical-seat slide valve that holds pressure instead of bleeding it — both aimed at the two parts that wear hardest.

✅ Easy Operation & Wide Application

Single-lever control, optional aviation-grade joystick remote, and synchronization with a forging manipulator. One frame covers 1 to 25 ton, so a hydraulic forging hammer bought for shafts still takes rings and discs — the open die forging process page explains how each shape is worked.

35-875kJ Model Range
The C66YA Series covers 13 strike-energy capacities from 35 kJ to 875 kJ — 1 ton to 25 ton nominal (1 t ≈ 35 kJ) — with falling mass from 1,300 kg to 28,000 kg. Send your forged part, material, required tonnage and annual output; we will recommend the model and send a quotation.

Product Features

  • 5 ton C66YA electro-hydraulic open die forging hammer on its foundation

    C66YA Series Fully Hydraulic Open Die Forging Hammer adopting an all-hydraulic drive system, this forging hammer delivers rapid striking and return speeds for enhanced production efficiency. Its flexible and easily controllable operation enables hammer suspension at any position, making it suitable for diverse free forging processes. Widely applied in manufacturing various types of free forgings, it is the preferred equipment for medium-to-large forgings and high-temperature alloy forgings.

    5 ton C66YA electro-hydraulic open die forging hammer on its foundation
  • Features of the Double-Arm Open-Type Hydraulic Hammer

    Fully hydraulic drive system/improves piston life Slide valve + conical valve structure/excellent system pressure maintain X guide rail structure/improves piston rod life Differential servo principle/flexible operation and easy control Improve return speed and blow frequency/high production efficiency Suitable for large and medium-sized free forgings/high cost-effective

    Features of the Double-Arm Open-Type Hydraulic Hammer
  • Powerful Striking Energy

    The unique striking valve system ensures precise energy control and exceptional repeatability.

    Powerful Striking Energy
  • High Production Efficiency

    With hydraulically driven striking and return strokes, the system features low backpressure in the upper chamber during return, eliminates muffled-hammer phenomena during strikes, and delivers fast return speed with high striking frequency.

    High Production Efficiency
  • Stable & Durable Structure with Easy Maintenance

    The fully hydraulic drive system ensures extended piston service life, while the X-guide rail structure multiplies the hammer rod's lifespan. With ultra-low failure rates and minimal maintenance costs, the machine delivers exceptional operational reliability.

    Stable & Durable Structure with Easy Maintenance
  • Remote-Controlled Automated Striking

    Upgradable with aviation-grade joystick controls for either remote automated or manual striking operations. The system perfectly replicates all original forging hammer movements and enables synchronized control with manipulators, achieving optimal inter-equipment coordination.

    Remote-Controlled Automated Striking

Product parameters

item unit C66YA-35 C66YA-70 C66YA-120 C66YA-140 C66YA-175 C66YA-210 C66YA-245 C66YA-280 C66YA-350 C66YA-420 C66YA-520 C66YA-630 C66YA-875
Strike energy kJ 35 70 120 140 175 210 245 280 350 420 520 630 875
Falling mass kg 1300 2650 4100 5100 6300 7500 8200 8800 12400 14400 16000 20000 28000
Maximum stroke mm 1000 1260 1450 1500 1730 1800 1850 1900 2000 2300 2480 2600 2600
Strike frequency min-1 60-75 60-75 60-75 60-75 50-65 45-60 45-60 40-55 40-55 40-55 35-50 33-48 40-44
Main motor power kW 55 55 55 55 55 55 55 55 55 75 75 75 75
Number of motors 台 2 3 4 5 6 7 7 8 10 8 10 16 18
Rail spacing mm 460 550 650 710 760 890 890 900 980 1120 1200 1550 1650
Operating space mm 1800×1250 2300×1380 2700×1470 3500×1650 3700×1930 4200×2000 4200×2000 4200×2250 4730×2350 4700×2450 5000×2780 5170×2800 5170*2700
Lower anvil mirror height mm 750 750 760 760 880 880 900 900 900 950 1200 1200 1250
Main engine dimensions mm 3600×1500×6300 4500×1700×7000 5100×2300×7800 5900×2300×8000 6300×2500×9000 6740×2500×9500 6740×2500×9600 6920×2600×10000 7720×2900×10600 8380×2950×11500 8700×3000×12000 8930×3100×12500 9200×3100
×13000

*Note:Above parameters are standard parameters and no announce if there are any changes.

Reading the C66YA Specifications

Five rows in the table above decide everything, and they are the five most often mixed up:

  • Strike energy (kJ) — the work one blow delivers. It is the model number itself: the C66YA-350 delivers 350 kJ.
  • Falling mass (kg) — the weight of the parts that come down. It sets how deep each blow bites; it is not a tonnage figure.
  • Nominal tonnage (t) — the conventional equivalent to a steam-air hammer of the same size, at roughly 1 t = 35 kJ. Converted in the table below.
  • Blow frequency (min-1) — strokes per minute, from 60-75 on the small capacities down to 33-48 on the 875 kJ.
  • Rail spacing and operating space — what decides whether your workpiece, and the manipulator holding it, fits in the window.

One row below looks wrong until you know why: the 630 kJ machine is called 18 ton while its falling mass is 20,000 kg, because tonnage and falling mass are different quantities — the first is an equivalent size, the second is a weight.

Capacities Strike energy Nominal tonnage
C66YA-35 35 kJ 1 ton
C66YA-70 70 kJ 2 ton
C66YA-120 120 kJ 3.5 ton
C66YA-140 140 kJ 4 ton
C66YA-175 175 kJ 5 ton
C66YA-210 210 kJ 6 ton
C66YA-245 245 kJ 7 ton
C66YA-280 280 kJ 8 ton
C66YA-350 350 kJ 10 ton
C66YA-420 420 kJ 12 ton
C66YA-520 520 kJ 15 ton
C66YA-630 630 kJ 18 ton
C66YA-875 875 kJ 25 ton

*Tonnage is the nominal equivalent size, rounded. Your part, its material and the reduction you need per blow decide the capacity — the table is the starting point for the conversation, not the answer.

Two of those rows interact in a way buyers ask about. Because the hydraulic system sets the blow energy rather than a fixed ram stroke, the ±1.5% repeatability holds from the first piece to the last — a sizing blow and a drawing-out blow can follow each other without a setup change.

The energy figure is not a cleverer motor — it is two losses that disappeared. A steam-air hammer pays for a boiler and for a compressed-air line before the blow is struck; on the C66YA both are gone and what remains is the oil circuit.

On durability, the ram runs on X-shaped guide rails inside a double-arm frame, and the main valve is a slide valve with a conical seat that holds system pressure instead of bleeding it at the seat. Hammer rod and guide wear are the two things that decide how often an open die hammer goes down, and that is where this design is aimed.

Technical detail: The full technical case for this frame — product overview, the design reasoning section by section, and the energy figures — is in the C66YA technical description.

On operation: single-lever control as standard, an aviation-grade joystick remote as an option, and either version can be synchronized with a forging manipulator. Because one frame runs from 1 to 25 ton, a machine bought for shaft work still takes rings, discs and preforms later.

Advantages in one place: If you want the advantages argued in one place rather than read off the table, the C66YA hydraulic forging hammer advantages cover the principle, the core features, the model parameters and where the machine is used.

What This Open Die Forging Hammer Forges

Open die hammer forging is a sequence of controlled blows between a flat or simply shaped upper tool and the workpiece on the lower anvil: the operator rotates and advances the billet between blows until the section comes down to size. That is what the C66YA is designed for, and it is why the machine is judged on blow energy, blow frequency and how precisely the operator can place each strike — not on a die cavity.

Workpiece types this hammer is normally tooled for:

  • Shafts and stepped shafts — from short blanks up to long bars worked under a manipulator
  • Discs, hubs and flanges — upset from cut billet on a flat anvil
  • Rings and hollow parts — forged over a mandrel
  • Blocks and square bars — including preforms that later go to a closed die hammer or press for finishing
  • Shell and tube sections — drawn out over a mandrel with the workpiece rotated between blows

Material families: carbon and low-alloy steels, medium-carbon alloy steels such as 42CrMo, tool and die steels, and high-temperature alloys. The last group is one of the reasons the hydraulic drive is chosen over a pneumatic hammer — blow energy is set by the hydraulic system rather than by a fixed ram stroke, so a short, light blow can follow a full-energy one without changing the setup.

Two numbers decide the capacity: the largest billet section you need to reduce per blow (that is strike energy), and the largest workpiece the anvil and manipulator have to carry (that is clearance, anvil size and rail spacing). Send a part drawing and we size the machine from those two, then check it against your annual output. The process side is covered in more depth on our open die forging process page.

C66YA vs C61YA: Single-Arm or Double-Arm

Both are full hydraulic open die hammers, and they overlap between 30 kJ and 350 kJ. So in that band the choice is not about capacity — it is about how the workpiece reaches the anvil, and how far up the range you may need to go later.

  C66YA (this page) C61YA
Frame Double-arm, ram guided on both sides Single-arm, open working space
Capacities / strike energy 13 capacities, 35–875 kJ 8 capacities, 30–350 kJ
Nominal tonnage 1–25 ton 1–10 ton
Falling mass 1,300–28,000 kg 1,300–12,000 kg

In the 140–350 kJ overlap, take the C61YA single-arm hammer when the operator has to swing long or awkward parts in from the side and 350 kJ already covers your largest section. Take the C66YA when you need the 420–875 kJ capacities, when two-sided guiding matters for straightness on long shafts, or when the hammer will sit in a fixed line under a manipulator.

Neither of them is a closed die machine. If your part is a repeating shape made in volume, the shaped cavity belongs on a die forging hammer — see the C86YA closed die forging hammer or the C92KA CNC die forging hammer.

If what you are replacing is an older steam or compressed-air hammer rather than a C61YA, C66YA against a steam hammer sets the two side by side on energy control, running cost and what changes on the foundation.

Installation and commissioning

This C66YA-280 was installed and commissioned on site before handover. The clip below shows a full striking cycle on a heated H13 die steel billet.

C66YA-280 (8 ton), 280 kJ rated energy, striking a heated H13 billet in Zhangqiu, Jinan.

Price, Lead Time and Ordering

There is no public price list, because a C66YA is configured to your requirements. The frame comes in 13 standard capacities; the anvil, the foundation scope, the controls and the electrical specification are set by your plant and your workpiece. If you have been searching for a hydraulic forging hammer for sale, the honest answer is that the configuration is set by your part — so here is what moves the price:

  • Capacity, sized to your workpiece — strike energy is chosen from the section you have to reduce per blow, so the 35 kJ and the 875 kJ are different machines, not options on one
  • Anvil block and foundation scope — whether the anvil, foundation bolts and load drawings are in your scope or ours
  • Control type — manual lever control as standard, or the aviation-grade joystick remote package
  • Manipulator integration — synchronized control with a forging manipulator changes the valve and control package
  • Electrical specification — voltage, phase and frequency for your plant
  • Spare parts package and shipping terms — which spares you keep on hand for the first year, and whether the quote is ex-works or delivered

To get an accurate quotation rather than a range, send five things: a drawing or clear photo of the forged part, the material grade, the billet size and weight, your target tonnage or strike energy, and your annual output. If a manipulator or a second hammer is going into the same line, say so — the layout affects the anvil and foundation drawing.

What comes back is a capacity recommendation with the reasoning, a quotation against your specification, the foundation load drawing, and the power and utility requirements for that machine. Lead time is quoted per order, because the capacity and the scope both move it: the machine is scheduled into production once the configuration is confirmed, so the date comes with the quotation rather than being guessed in advance. If you are still comparing hydraulic against pneumatic, the C41A pneumatic forging hammer page carries the same parameter format for a direct comparison.

Open Die Forging Hammer FAQ

What does "8 ton" mean on this hammer?

C66YA machines are named by strike energy. The tonnage is the conventional equivalent to a steam-air hammer of the same nominal size, at roughly 1 t = 35 kJ — so 280 kJ is the 8 ton machine and 350 kJ is the 10 ton machine. Falling mass is a separate figure (8,800 kg on the 280 kJ) and should not be read as tonnage.

Is a hydraulic forging hammer the same as an electro-hydraulic hammer?

In our range, yes. Electro-hydraulic and full hydraulic both mean the ram is driven by a hydraulic power unit with an electric motor, rather than by steam or compressed air. If you already run pneumatic hammers and want to keep the frame, we also convert existing machines — see old pneumatic hammers retrofitted into electro-hydraulic hammers.

Can this hammer work with a forging manipulator?

Yes. Ordered with the joystick remote package, the C66YA reproduces the manual lever movements and can be synchronized with a manipulator so the two machines work as one line. See the T31 forging manipulator for the matching sizes.

Open die or closed die — which one do I need?

Open die shapes the workpiece between flat or simple tools and suits one-off parts, large shafts and preforms. Closed die uses a machined cavity and suits a repeating part made in quantity. The C66YA is open die only; for closed die, use the C86YA or the C92KA.

How much energy does it save compared with a steam-air hammer?

The figure we quote for this range is over 60% less energy than a steam-air hammer of the same nominal size. The exact number depends on your cycle time and part mix, and it can be worked out from your existing hammer's steam or air consumption per shift.

What do you need from me to specify a machine?

A drawing or photo of the forged part, the material grade, the billet size and weight, your target tonnage or strike energy, the space and foundation limits on site, and your annual output. With those we can name a capacity on the first reply instead of sending a range.

Is the C66YA a fixed model, or configurable to my requirements?

Configurable. The 13 capacities are standard frame sizes; the anvil, the foundation scope, the control package and the electrical specification are set per project. That is also why there is no published price — the number depends on the configuration you choose.

How long does delivery take?

It is fixed on the quotation rather than read off a table, because the capacity and the scope both move it. The machine is scheduled into production once the configuration is confirmed, and the date you are given is tied to that schedule — ask for it with the quotation so you are comparing the same basis.

Hot Products

Send Message

contact

Metal Forming Expert

High quality metal forming equipment

Professional technical support services

Worry free after-sales maintenance service

    • *

    • *

    Home Tel Mail Inquiry